![]() Intersection design improvements included: roadway widening to construct protected left turn lanes for safety and additional capacity traffic signal installation for control of vehicular traffic pedestrian signals with a protected phase for safety of pedestrians construction of ADA-compliant sidewalks and wheelchair ramps to improve pedestrian accessibility and the installation of new signs and pavement markings. The analyses results with recommendations were compiled in a Functional Design Report submitted with preliminary design plans to MassDOT and the Town of Andover for approval. Traffic volume data and accident history were used to perform a complete analysis of the intersection. Specific items of work included performing an instrument survey to assemble design base plans. The project objectives were to design a traffic signal to improve safety and efficiency for vehicular and pedestrian activity, taking into account the peaking characteristics of the adjacent IRS facility in the Town of Andover. Bayside Engineering’s services on this project began at the planning phase, continued through to the design development stage and concluded with Final Acceptance of the project after providing construction administration and conducting a successful field inspection. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |